Testing Framework Examples¶
This directory contains comprehensive, production-quality example artifacts demonstrating how to apply the BGSTM testing framework in real-world scenarios. All examples are based on a consistent fictional project: the ShopFlow E-Commerce Platform - Checkout Module Enhancement.
Fictional Project Context¶
Project Name: ShopFlow E-Commerce Platform - Checkout Module Enhancement
Project Code: Release 3.5
Duration: January 8 - April 3, 2024 (12 weeks)
Methodology: Agile/Scrum (2-week sprints)
Team Size: 8 QA professionals + supporting roles
Project Overview:
The ShopFlow Checkout Enhancement project aims to modernize and streamline the e-commerce checkout experience by implementing guest checkout, integrating multiple payment gateways (PayPal, Apple Pay, Google Pay), improving mobile responsiveness, and ensuring WCAG 2.1 accessibility compliance.
Key Features: - Guest checkout functionality - Multiple payment method integration - Real-time shipping cost calculation - Promotional code system - Mobile-responsive design - Accessibility compliance (WCAG 2.1 AA)
Available Examples¶
Phase 1: Test Planning¶
📄 Test Plan Example - Complete test plan document (21,000+ words) - Comprehensive test strategy and approach - Resource allocation and scheduling - Risk assessment matrix - Both Agile and Waterfall variations - Entry/exit criteria - Quality gates and metrics
When to use: During initial test planning phase to define testing strategy, scope, resources, and timeline.
Phase 2: Test Case Development¶
📄 Test Case Suite Example - 12 detailed test cases with complete steps - Multiple test types: functional, integration, negative - Various priority levels (High, Medium, Low) - Mobile and cross-browser test cases - Positive and negative scenarios - Expected vs actual results format
Test Case Coverage: - Guest checkout flows - Payment gateway integration (PayPal, Apple Pay, Google Pay) - Promotional codes - Mobile responsiveness - Error handling - Session management
When to use: During test case development to see examples of well-structured, professional test cases.
Phase 3: Test Environment Preparation¶
📄 Environment Setup Checklist Example - Comprehensive environment setup guide (36,000+ words) - Hardware and software requirements - Infrastructure configuration - Third-party integration setup (payment gateways, shipping APIs) - Test data preparation - Security configuration - Monitoring and logging setup - Validation procedures
Includes: - Server specifications and configuration - Database setup and replication - Load balancer configuration - Test tool installation - Access credentials (sanitized examples) - Sign-off checklist
When to use: Before test execution begins to ensure test environment is properly configured and validated.
Phase 4: Test Execution¶
📄 Defect Report Example - 10 realistic defect reports - Multiple severity levels (Critical, High, Medium, Low) - Complete defect lifecycle from identification to closure - Screenshots and attachment references - Root cause analysis - Verification steps
Example Defects: - Critical payment processing failures - Mobile browser crashes - Integration issues - Security vulnerabilities - Usability problems - Cosmetic defects
When to use: During test execution when logging defects to understand proper defect documentation standards.
Phase 5: Test Results Analysis¶
📄 Risk Assessment Matrix Example - Comprehensive risk identification and tracking (29,000+ words) - Risk scoring methodology (Impact × Likelihood) - Risk heat map visualization - 13 active risks with mitigation strategies - Technical, process, and resource risks - Weekly risk review process - Escalation procedures
Risk Categories: - Technical risks (performance, integration, compatibility) - Resource risks (team availability, environment capacity) - Schedule risks (delays, scope creep) - Compliance risks (security, certification)
📄 Testing Schedule Example - Detailed Agile sprint schedule (28,000+ words) - Waterfall methodology comparison - Day-by-day task breakdown - Resource allocation by role - Milestones and dependencies - Buffer time and risk mitigation - Test metrics and progress tracking
Schedule Coverage: - Sprint planning and execution (3 sprints) - Regression testing phase - UAT (User Acceptance Testing) - Production release timeline
When to use: During test planning and throughout execution to track progress and manage risks.
Phase 6: Test Results Reporting¶
📄 Traceability Matrix Example - Complete requirements traceability matrix (30,000+ words) - 64 requirements mapped to 350 test cases - Test execution status and results - Defect linkage to requirements - Coverage analysis (100% coverage achieved) - Compliance validation (PCI-DSS, WCAG 2.1 AA) - Gap analysis
Traceability Coverage: - Functional requirements (37 requirements) - Non-functional requirements (27 requirements) - Performance, security, accessibility, mobile - All requirements verified and signed off
When to use: Throughout testing to maintain traceability and at project completion for final reporting and sign-off.
How to Use These Examples¶
1. As Learning Materials¶
- Study the structure and format of each artifact
- Understand what information to include
- Learn industry best practices
- See how different elements connect across phases
2. As Templates¶
- Use as starting points for your own documents
- Adapt the structure to your project needs
- Customize content for your organization
- Maintain consistency across artifacts
3. As Reference Guides¶
- Refer back when creating similar documents
- Compare your work against professional standards
- Validate your approach
- Identify what you might be missing
4. For Training¶
- Train new team members on testing processes
- Demonstrate what "production-quality" means
- Provide concrete examples during workshops
- Set expectations for documentation quality
5. For Process Improvement¶
- Evaluate your current documentation practices
- Identify gaps in your processes
- Standardize team documentation
- Improve communication with stakeholders
Example Consistency¶
All examples in this directory follow a consistent fictional project (ShopFlow E-Commerce Checkout) to demonstrate: - How artifacts relate to each other - How information flows between testing phases - How to maintain consistency across documents - How to track requirements, tests, and defects end-to-end
Cross-References: - Test cases reference the test plan - Defect reports link to test cases - Risk assessment references schedule and resources - Traceability matrix ties everything together - All use the same requirement IDs and test case IDs
Methodology Variations¶
Many examples include variations showing how to adapt for different methodologies:
Agile/Scrum Approach¶
- Sprint-based testing
- Iterative test planning
- Continuous feedback loops
- Lightweight documentation
- Daily standups and sprint reviews
Waterfall Approach¶
- Phase-gate testing
- Comprehensive upfront planning
- Sequential execution
- Detailed documentation
- Formal approvals and sign-offs
Examples show both approaches where applicable, particularly in: - Test Plan (Appendix A: Waterfall Variation) - Testing Schedule (dedicated Waterfall section) - Risk Assessment (adapted for phase-based approach)
Quality Standards¶
All examples demonstrate:
✅ Professional Language and Formatting - Clear, concise writing - Proper grammar and spelling - Consistent terminology - Professional tone
✅ Completeness - No placeholders or "TBD" sections - Full details and specifics - Real-world scenarios - Actionable information
✅ Realistic Content - Based on actual testing challenges - Industry-standard practices - Common project scenarios - Practical solutions
✅ Production-Ready Quality - Can be used as-is or with minimal changes - Reviewed for accuracy - Follows industry standards - Includes best practices
✅ Educational Value - Explanatory comments where helpful - Best practices highlighted - Common pitfalls addressed - Learning objectives clear
File Size and Scope¶
| Example | File Size | Word Count | Sections | Detail Level |
|---|---|---|---|---|
| Test Plan | 21,877 chars | ~3,500 words | 14 major sections | Comprehensive |
| Test Cases | 31,634 chars | ~4,500 words | 12 test cases | Detailed |
| Environment Setup | 36,041 chars | ~5,200 words | 15 sections | Very detailed |
| Defect Reports | 28,681 chars | ~4,000 words | 10 defects | Complete |
| Risk Assessment | 29,338 chars | ~4,500 words | 10 risks + tracking | Comprehensive |
| Testing Schedule | 27,954 chars | ~4,200 words | Multiple timelines | Detailed |
| Traceability Matrix | 30,324 chars | ~4,100 words | 64 requirements | Comprehensive |
Total: ~175,000 characters (~30,000 words) of professional testing documentation
Related Documentation¶
BGSTM Framework¶
- Phase 1: Test Planning
- Phase 2: Test Case Development
- Phase 3: Test Environment Preparation
- Phase 4: Test Execution
- Phase 5: Test Results Analysis
- Phase 6: Test Results Reporting
Templates¶
Methodologies¶
Contributing Examples¶
Have practical examples from your projects? Consider contributing!
Guidelines: 1. Remove Confidential Information - No real company names, products, or people - No actual credentials or API keys - No proprietary information - Generalize specific details
- Follow Consistent Format
- Use the same structure as existing examples
- Maintain professional tone
- Include complete information
-
Proofread carefully
-
Provide Context
- Describe the project scenario
- Explain the testing approach
- Document any unique aspects
-
Note lessons learned
-
Submit via Pull Request
- Follow contribution guidelines in CONTRIBUTING.md
- Include description of the example
- Explain how it adds value
- Be open to feedback
Feedback and Improvements¶
These examples are continuously improved based on community feedback.
How to provide feedback: - Open an issue on GitHub describing improvements - Submit a pull request with corrections - Share suggestions for new examples - Report any errors or inconsistencies
Planned additions: - Performance test report example - Security test report example - UAT sign-off document example - Test automation framework documentation
License and Usage¶
These examples are provided under the same license as the BGSTM framework. You are free to: - Use them in your projects - Modify them for your needs - Share them with your team - Adapt them for training
Please: - Give credit to the BGSTM project - Share improvements back to the community - Maintain attribution in derived works - Follow your organization's policies
Quick Navigation¶
| Phase | Example | Key Use Case |
|---|---|---|
| 1 | Test Plan | Define strategy and scope |
| 2 | Test Cases | Create test scenarios |
| 3 | Environment Setup | Configure test environment |
| 4 | Defect Reports | Document issues |
| 5 | Risk Assessment | Manage risks |
| 5 | Testing Schedule | Plan and track progress |
| 6 | Traceability Matrix | Verify coverage |
Document Last Updated: 2024-03-15
Examples Version: 1.0
Based on: BGSTM Framework v1.x
For questions or support, please refer to the main BGSTM documentation or open an issue on GitHub.