Skip to content

Testing Framework Examples

This directory contains comprehensive, production-quality example artifacts demonstrating how to apply the BGSTM testing framework in real-world scenarios. All examples are based on a consistent fictional project: the ShopFlow E-Commerce Platform - Checkout Module Enhancement.


Fictional Project Context

Project Name: ShopFlow E-Commerce Platform - Checkout Module Enhancement
Project Code: Release 3.5
Duration: January 8 - April 3, 2024 (12 weeks)
Methodology: Agile/Scrum (2-week sprints)
Team Size: 8 QA professionals + supporting roles

Project Overview:
The ShopFlow Checkout Enhancement project aims to modernize and streamline the e-commerce checkout experience by implementing guest checkout, integrating multiple payment gateways (PayPal, Apple Pay, Google Pay), improving mobile responsiveness, and ensuring WCAG 2.1 accessibility compliance.

Key Features: - Guest checkout functionality - Multiple payment method integration - Real-time shipping cost calculation - Promotional code system - Mobile-responsive design - Accessibility compliance (WCAG 2.1 AA)


Available Examples

Phase 1: Test Planning

📄 Test Plan Example - Complete test plan document (21,000+ words) - Comprehensive test strategy and approach - Resource allocation and scheduling - Risk assessment matrix - Both Agile and Waterfall variations - Entry/exit criteria - Quality gates and metrics

When to use: During initial test planning phase to define testing strategy, scope, resources, and timeline.


Phase 2: Test Case Development

📄 Test Case Suite Example - 12 detailed test cases with complete steps - Multiple test types: functional, integration, negative - Various priority levels (High, Medium, Low) - Mobile and cross-browser test cases - Positive and negative scenarios - Expected vs actual results format

Test Case Coverage: - Guest checkout flows - Payment gateway integration (PayPal, Apple Pay, Google Pay) - Promotional codes - Mobile responsiveness - Error handling - Session management

When to use: During test case development to see examples of well-structured, professional test cases.


Phase 3: Test Environment Preparation

📄 Environment Setup Checklist Example - Comprehensive environment setup guide (36,000+ words) - Hardware and software requirements - Infrastructure configuration - Third-party integration setup (payment gateways, shipping APIs) - Test data preparation - Security configuration - Monitoring and logging setup - Validation procedures

Includes: - Server specifications and configuration - Database setup and replication - Load balancer configuration - Test tool installation - Access credentials (sanitized examples) - Sign-off checklist

When to use: Before test execution begins to ensure test environment is properly configured and validated.


Phase 4: Test Execution

📄 Defect Report Example - 10 realistic defect reports - Multiple severity levels (Critical, High, Medium, Low) - Complete defect lifecycle from identification to closure - Screenshots and attachment references - Root cause analysis - Verification steps

Example Defects: - Critical payment processing failures - Mobile browser crashes - Integration issues - Security vulnerabilities - Usability problems - Cosmetic defects

When to use: During test execution when logging defects to understand proper defect documentation standards.


Phase 5: Test Results Analysis

📄 Risk Assessment Matrix Example - Comprehensive risk identification and tracking (29,000+ words) - Risk scoring methodology (Impact × Likelihood) - Risk heat map visualization - 13 active risks with mitigation strategies - Technical, process, and resource risks - Weekly risk review process - Escalation procedures

Risk Categories: - Technical risks (performance, integration, compatibility) - Resource risks (team availability, environment capacity) - Schedule risks (delays, scope creep) - Compliance risks (security, certification)

📄 Testing Schedule Example - Detailed Agile sprint schedule (28,000+ words) - Waterfall methodology comparison - Day-by-day task breakdown - Resource allocation by role - Milestones and dependencies - Buffer time and risk mitigation - Test metrics and progress tracking

Schedule Coverage: - Sprint planning and execution (3 sprints) - Regression testing phase - UAT (User Acceptance Testing) - Production release timeline

When to use: During test planning and throughout execution to track progress and manage risks.


Phase 6: Test Results Reporting

📄 Traceability Matrix Example - Complete requirements traceability matrix (30,000+ words) - 64 requirements mapped to 350 test cases - Test execution status and results - Defect linkage to requirements - Coverage analysis (100% coverage achieved) - Compliance validation (PCI-DSS, WCAG 2.1 AA) - Gap analysis

Traceability Coverage: - Functional requirements (37 requirements) - Non-functional requirements (27 requirements) - Performance, security, accessibility, mobile - All requirements verified and signed off

When to use: Throughout testing to maintain traceability and at project completion for final reporting and sign-off.


How to Use These Examples

1. As Learning Materials

  • Study the structure and format of each artifact
  • Understand what information to include
  • Learn industry best practices
  • See how different elements connect across phases

2. As Templates

  • Use as starting points for your own documents
  • Adapt the structure to your project needs
  • Customize content for your organization
  • Maintain consistency across artifacts

3. As Reference Guides

  • Refer back when creating similar documents
  • Compare your work against professional standards
  • Validate your approach
  • Identify what you might be missing

4. For Training

  • Train new team members on testing processes
  • Demonstrate what "production-quality" means
  • Provide concrete examples during workshops
  • Set expectations for documentation quality

5. For Process Improvement

  • Evaluate your current documentation practices
  • Identify gaps in your processes
  • Standardize team documentation
  • Improve communication with stakeholders

Example Consistency

All examples in this directory follow a consistent fictional project (ShopFlow E-Commerce Checkout) to demonstrate: - How artifacts relate to each other - How information flows between testing phases - How to maintain consistency across documents - How to track requirements, tests, and defects end-to-end

Cross-References: - Test cases reference the test plan - Defect reports link to test cases - Risk assessment references schedule and resources - Traceability matrix ties everything together - All use the same requirement IDs and test case IDs


Methodology Variations

Many examples include variations showing how to adapt for different methodologies:

Agile/Scrum Approach

  • Sprint-based testing
  • Iterative test planning
  • Continuous feedback loops
  • Lightweight documentation
  • Daily standups and sprint reviews

Waterfall Approach

  • Phase-gate testing
  • Comprehensive upfront planning
  • Sequential execution
  • Detailed documentation
  • Formal approvals and sign-offs

Examples show both approaches where applicable, particularly in: - Test Plan (Appendix A: Waterfall Variation) - Testing Schedule (dedicated Waterfall section) - Risk Assessment (adapted for phase-based approach)


Quality Standards

All examples demonstrate:

✅ Professional Language and Formatting - Clear, concise writing - Proper grammar and spelling - Consistent terminology - Professional tone

✅ Completeness - No placeholders or "TBD" sections - Full details and specifics - Real-world scenarios - Actionable information

✅ Realistic Content - Based on actual testing challenges - Industry-standard practices - Common project scenarios - Practical solutions

✅ Production-Ready Quality - Can be used as-is or with minimal changes - Reviewed for accuracy - Follows industry standards - Includes best practices

✅ Educational Value - Explanatory comments where helpful - Best practices highlighted - Common pitfalls addressed - Learning objectives clear


File Size and Scope

Example File Size Word Count Sections Detail Level
Test Plan 21,877 chars ~3,500 words 14 major sections Comprehensive
Test Cases 31,634 chars ~4,500 words 12 test cases Detailed
Environment Setup 36,041 chars ~5,200 words 15 sections Very detailed
Defect Reports 28,681 chars ~4,000 words 10 defects Complete
Risk Assessment 29,338 chars ~4,500 words 10 risks + tracking Comprehensive
Testing Schedule 27,954 chars ~4,200 words Multiple timelines Detailed
Traceability Matrix 30,324 chars ~4,100 words 64 requirements Comprehensive

Total: ~175,000 characters (~30,000 words) of professional testing documentation


BGSTM Framework

Templates

Methodologies


Contributing Examples

Have practical examples from your projects? Consider contributing!

Guidelines: 1. Remove Confidential Information - No real company names, products, or people - No actual credentials or API keys - No proprietary information - Generalize specific details

  1. Follow Consistent Format
  2. Use the same structure as existing examples
  3. Maintain professional tone
  4. Include complete information
  5. Proofread carefully

  6. Provide Context

  7. Describe the project scenario
  8. Explain the testing approach
  9. Document any unique aspects
  10. Note lessons learned

  11. Submit via Pull Request

  12. Follow contribution guidelines in CONTRIBUTING.md
  13. Include description of the example
  14. Explain how it adds value
  15. Be open to feedback

Feedback and Improvements

These examples are continuously improved based on community feedback.

How to provide feedback: - Open an issue on GitHub describing improvements - Submit a pull request with corrections - Share suggestions for new examples - Report any errors or inconsistencies

Planned additions: - Performance test report example - Security test report example - UAT sign-off document example - Test automation framework documentation


License and Usage

These examples are provided under the same license as the BGSTM framework. You are free to: - Use them in your projects - Modify them for your needs - Share them with your team - Adapt them for training

Please: - Give credit to the BGSTM project - Share improvements back to the community - Maintain attribution in derived works - Follow your organization's policies


Quick Navigation

Phase Example Key Use Case
1 Test Plan Define strategy and scope
2 Test Cases Create test scenarios
3 Environment Setup Configure test environment
4 Defect Reports Document issues
5 Risk Assessment Manage risks
5 Testing Schedule Plan and track progress
6 Traceability Matrix Verify coverage

Document Last Updated: 2024-03-15
Examples Version: 1.0
Based on: BGSTM Framework v1.x

For questions or support, please refer to the main BGSTM documentation or open an issue on GitHub.